Guangzhou Dishen Plastics Materials Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Chen Michael
  • Company Name : Guangzhou Dishen Plastics Materials Co., Ltd.
  • Tel : 00-86-13622767450
  • Fax : 00-86-13902262548
  • Address : Guangdong,Guangzhou,shentian Industrial Park, Huadong Town, Huadu District
  • Country/Region : China

elastic basketball court paint

elastic basketball court paint
Product Detailed
1.FIBA certified 2.output:60 tons per day 3.material:polyurethane 4.color:red,green,blue 5.factory history:10 years

Elastic Basketball Court Paint

1.Main materials:liquid PU panit,recyled SBR granules

2.Usage Introduction of 8mm thickness PU sandwich system sports flooring

Item No.

Material

Dosage(kg/square meter)

1

Waterproof adhesive

0.15

2

SBR granules

5

3

Single-component glue

0.56

4

SBR powder

0.5

5

PU back coating

1.5

6

PU surface coating

2.4

7

PU anti-slip paint

0.15

8

drier

0.04

9

stripe  paint

0.01

3.We can design freely according to your size

4.color:red,green,blue,etc.This can be customized.

5.Thickness:3-8mm is available.

6.Packaging:iron barrel or plastic barrel

7.International standard

8.Application:basketball court,tennis court,badminton court,etc.

9.Types:Full PU/mixed PU/composite PU/Silicon PU

This is our construction site.We can assign professional construction team to help you install the projects.

Quality guarantee:at least 8 years,non-fading,non-foaming,no-delamination.

We can supply different kinds of sport flooring and running track.Welcome your inquiry!

Concrete Sub-base Requirements for Silicon PU Sports Flooring

1.Maintenance period for new concrete sub-bsase: at least 28 days.

2.Concrete sub-base thickness: about 15 cm

3.Concrete surface should be smooth,the acceptable deviation for 3m is ±3mm.If  the surface is uneven,please grind the surface.

4.The strength of concrete foundation shouldn't be less than C25.The concrete  surface should be dense and strong.There is no crack,delamination and powder on the surface.

5.In order to drain quickly,you should construct drainage ditch around the sports  flooring.The slope on the surface is 5‰~ 8‰.The design should meet requirements.

6.Because the concrete will expand with heat and contract with cold.Before install  our silicon PU,you can dig an expansion joint like"V"shape.the size is about 8mm(width)*8mm(length)*30mm(depth).You can use SBR and PU glue to fill the joint.This way can prevent  concrete cracking.

7.Before installation our silicon PU sports flooring,please test the alkalinity of  concrete.If the PH value is 12~14,please stop constructing.Because our silicon PU materials can't be applied on highly alkaline sub-base.

elastic basketball court paint



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.